In the past, we have struggled with transportation in and out of Chemi Chemi due…
Retreat Center Update
Infrastructure on the property has been completed: well, pump & water lines; electrical power; septic system; security; lighted walkways.
We have just completed building a “safari camp” replica on the property that has already housed two school terms (Dec. & Feb.) and the camp will be ready for group rentals later in the year.
- Each platformed tent sleeps up to four people with luxury amenities including private bath with toilet, shower, double sinks and covered deck. See tent interior above.
- A large tented dining/meeting room is also available.
- A separate kitchen building has also been completed.
Our next plans include the following:
- Landscape the tent camp area
- Plant our high-yield garden
- Construct an outdoor slate dining/events patio with fireplace
- Build a permanent classroom building with library
This Post Has 0 Comments